We were approached last year to provide an alternate quote for a marquee Central London refurbishment. The project required trench heating over 5 floors abutting both the glazed walling, but more unusually for two circular runs in the centre of the building. We were able to meet the required heating outputs with black grilles and all at a significant cost saving for the customer, Bancroft. Custom top hats were provided to allow the trench units to be supported across various heights and all within a short turnaround time of 6 weeks from initial enquiry to product being delivered to site. If you have a similar need then please get in touch. We pride ourselves on handling these time critical situations.

 

 

1 Poultry refurbishment, Central London. A project run by Bancroft

1 Poultry refurbishment, Central London. A project run by Bancroft

Trench Heating abutting the glazed wall with views to the Walkie Talkie buildling