Warwick University

With glazing panels extending to the floor in these large open plan spaces, the architect had set a real design challenge. The low level perimeter heating had to exactly follow the building line, indenting perfectly into the window bays. It was decided to make a feature of the grille by adding in breaks at each column rather than supply a continuous run of grille. This bespoke design allowed for on site adjustment at the fitting stage to accommodate any deviation of the final plastered finish, significantly reducing installation time and thus cost. Our UK based design and manufacture team were ideally placed to support and deliver on this challenging design to provide the best possible heating solution for the client.